Full Floor Demolition
We tear out tile, hardwood, engineered hardwood planks, laminate planks, vinyl plank, carpet, and underlayment. Cutting, prying, and pulling is all included, along with removal of flooring nails, staples, and transition strips.
Every tear-out quote we write covers the full job, not just the demolition. Here is what is included when you hire us for floor removal in Austin, and what we quote separately if your subfloor needs repair.
We tear out tile, hardwood, engineered hardwood planks, laminate planks, vinyl plank, carpet, and underlayment. Cutting, prying, and pulling is all included, along with removal of flooring nails, staples, and transition strips.
Tile and glued-down hardwood leave residue behind. We grind thinset and scrape adhesive off the slab so the surface is flat and ready for new flooring. This is included on every tear-out, not billed as an extra.
Zip walls, plastic sheeting, and negative air containment go up before demolition starts. We seal HVAC returns and doorways so silica dust from thinset and old adhesive stays in the work zone.
Every plank, tile shard, and bag of debris goes into our truck and leaves with us. No dumpster rental, no HOA complaints, no pile of old flooring sitting in your driveway for a week.
We run a moisture meter across the slab after tear-out and flag any readings that could cause floor cupping or warping later. If the slab is dry, we tell you. If it is not, we quote the fix.
We sweep and vacuum the work zone, walk the subfloor with you, and hand off a photo record of anything we flagged. Your installer, or ours, can start the next day.
Floor removal and demolition Austin TX is the controlled tear-out of existing flooring down to the subfloor, including tile, thinset, hardwood, laminate, vinyl plank, and underlayment. We cut the old floor into manageable sections, pry it up with pry bars and oscillating multi-tools, scrape residual adhesive, pull stubborn flooring nails and staples, and check the slab or plywood for moisture with a moisture meter before anything new goes down. If the subfloor is uneven, cupped, or water-damaged, we flag it and fix it before installation day.
Most Austin homeowners call us for one of four reasons: a kitchen or bathroom remodel, water damage from a slab leak or a burst supply line, a full-home refloor before selling, or replacing worn carpet and laminate with solid hardwood planks or engineered hardwood planks. Older Central Austin homes often hide surprises under the old floor, from cracked tile backer to pet stains and odor soaked into the plywood. We price the tear-out honestly, show you what we find, and keep the dust contained while we work.
Five steps, no mystery. Here is exactly what happens from the first phone call to the moment your subfloor is ready for new flooring.
Schedule
Call or book online — a real human picks up and confirms a 2-hour arrival window.
Diagnose
Licensed tech inspects on-site, then walks you through the cause and your options.
Fix
The job is completed to code and done right the first time — no shortcuts, no surprises.
Guarantee
Every job backed by a written workmanship warranty — and we stand behind it.
Demo Hammer
Breaks up tile and thinset fast without cracking the slab underneath. Essential on Austin bathrooms and kitchens with glued-down tile.
Oscillating Multi-Tool
Cuts flooring into strips at doorways and along walls so we can pry it up in sections instead of fighting the whole room at once.
Pry Bars
Lifts hardwood, laminate, and vinyl plank without damaging baseboards or door casings. We keep three sizes on the truck.
Moisture Meter
Reads slab moisture after tear-out. Austin slabs can hold moisture for weeks after a leak, and installing over a wet slab causes cupping.
Dust Containment System
Zip walls and negative air keep silica dust from thinset and old adhesive out of your HVAC, cabinets, and the rest of the house.
Flooring Stapler & Nail Gun
Used on the rebuild side when we install new hardwood after tear-out. Proper fastening keeps planks tight and quiet.
Buffer
Runs over the subfloor after grinding to smooth rough patches and prep the surface for patching compound or new underlayment.
Sectional Tear-Out
We cut the floor into 3- to 4-foot strips and pull them up one at a time. This keeps the debris manageable, protects walls and doorways, and lets us spot subfloor damage early instead of after the whole floor is gone.
Dust Containment First
Zip walls and negative air go up before the first pry bar touches the floor. On every job, not just the big ones. Silica dust is a real health issue and it wrecks HVAC filters, so we spend the extra 45 minutes.
Moisture Testing Before Install
We run a moisture meter across the slab after tear-out and record readings. If the slab is wet, we flag it and recommend a fix before new flooring goes down. This is the step that prevents floor cupping six months later.
Subfloor Flatness Check
We check the subfloor with a straightedge and grind or fill any spot more than 3/16 inch out of plane. Flat subfloor is what keeps new vinyl plank seams tight and laminate from rocking.
Debris Segregation & Haul-Off
We separate tile, wood, and metal staples into different bags so recyclable material stays out of the landfill where possible. Everything leaves in our truck the same day we finish.
01
What we do: We demo the tile with a hammer, grind the thinset flat, and check the slab for cracks that need filling. Dust containment keeps the rest of the house clean while the kitchen is torn up.
→ Subfloor ready for new tile or hardwood in two days, with no dust in the living room and no debris pile in the driveway.
02
What we do: We pull the wet laminate and underlayment, moisture-test the slab, and dry the area. Once the slab reads dry, we prep it for new vinyl plank so the unit can be re-rented fast.
→ Unit back on the market in under a week, with no lingering odor and a floor that will not cup again.
03
What we do: We tear out carpet and laminate in one day, haul everything off, and prep the slab for engineered hardwood. The seller schedules install for the following week.
→ Listing photos show clean, modern floors, and the condo sells without a flooring credit to the buyer.
04
What we do: We pull 1,800 square feet of tile, carpet, and laminate over three days, grinding thinset and prepping the slab room by room so the installer can start immediately.
→ One crew handles tear-out and prep, saving the homeowner a week of coordination and a second mobilization fee.
Austin sits on expansive clay soil, and that clay moves with every wet and dry cycle. Slabs crack, heave, and settle, which is why we check subfloor flatness on every tear-out in Travis County. Summer humidity from the Gulf pushes indoor moisture up, and winter cold snaps drive the other direction. Both cycles stress flooring, especially laminate and vinyl plank that was installed tight against the walls. Older homes in Zilker, Travis Heights, and Hyde Park often have pier-and-beam construction with original pine subfloors that need different handling than a modern slab. We adjust our tear-out method to the build, not the other way around. If you are searching for floor demolition in Austin open now, we run crews six days a week and can usually be on-site within 48 hours.
Downtown Austin
Condos and high-rises with strict HOA rules on noise hours and elevator use. We schedule tear-out around building quiet hours and protect common areas.
Zilker
Mix of 1950s bungalows on pier-and-beam and newer infill builds on slab. Tear-out method changes block by block, so we inspect before we quote.
Circle C
1990s and 2000s slab homes with glued-down tile and laminate. Thinset grinding is almost always part of the job here.
Westlake
Larger homes with multiple flooring types under one roof. We often run two crews to keep the tear-out on schedule.
Lakeway
Hill Country homes with slab movement from clay and limestone. Moisture testing after tear-out is critical here.
Expansive clay soil under Austin slabs
Slabs move seasonally, causing cracks and high spots. We grind and patch after tear-out so new flooring sits flat.
Summer humidity from the Gulf
Indoor humidity climbs in July and August, which can cup laminate and warp solid hardwood. We moisture-test before install and recommend acclimation time.
Winter cold snaps and slab movement
Freeze events crack slabs and pop tile. We see a spike in tear-out calls after every hard freeze in Central Texas.
Older homes with lead paint on trim
Pre-1978 homes in Central Austin may have lead paint on baseboards and thresholds. Our EPA Lead-Safe Certification covers safe handling during tear-out.
Old floors fail in predictable ways, and Austin's humidity and slab construction make some of them worse. Here are the problems we see most often and how tear-out fixes them.
Problem
Wet underlayment traps moisture against the slab, causing mold, odor, and floor cupping that spreads to adjacent rooms within weeks.
Our Fix
We pull the damaged floor, moisture-test the slab, and dry the area before anything new goes down. If the damage is contained to one room, we tear out only that section and blend the new floor into the existing one.
Problem
Urine soaks through carpet and laminate into the subfloor. The smell comes back on humid days and no amount of cleaning gets rid of it.
Our Fix
Tear-out is the only real fix. We remove the flooring and any saturated underlayment, treat the subfloor, and seal it before new flooring goes down. In severe cases we replace the affected plywood sections.
Problem
High spots telegraph through new vinyl plank or laminate, causing seams to open and planks to rock. Low spots let water pool under the floor.
Our Fix
After tear-out we grind high spots flat and fill low spots with patching compound. That gives your new floor a level base and keeps seams tight for years.
Problem
Squeaks mean the subfloor has loosened from the joists or the old floor was installed over a bad base. New flooring on top will squeak too.
Our Fix
We pull the old floor, re-secure the subfloor with flooring nails or screws, and check the joists. Once the base is solid, new flooring goes down quiet and stays quiet.
A clean tear-out protects everything you are not replacing. Here is what you get when you hire us for floor removal in Austin instead of renting a dumpster and swinging a sledgehammer yourself.
Dust Stays Contained
We run a dust containment system with plastic sheeting and negative air on every job. Tile thinset and old adhesive throw fine silica dust that settles into HVAC returns and cabinets, so we seal doorways and zip-wall the work zone before the first pry bar touches the floor. You keep breathing clean air in the rest of the house.
Subfloor Inspected, Not Ignored
Pulling the old floor is the only honest way to inspect what is underneath. We check for uneven subfloor, water damage, squeaky floors, and floor cupping, then tell you what needs fixing before new planks go down. Skipping that step is how a brand-new floor starts creaking within a year.
Debris Hauled Same Day
We load every plank, tile shard, staple, and scrap of underlayment into our truck and take it away. No dumpster sitting in your driveway for a week, no HOA letter, no pile of old flooring in the garage. Most residential tear-outs leave the property clean the same day we finish.
Ready for the Next Floor
Tear-out is only half the job. We scrape adhesive, pull flooring nails, grind high spots, and vacuum the slab so your installer, or ours, can start immediately. That saves a day or two of prep on a typical 800-square-foot Austin tear-out and keeps your remodel on schedule.
Google ★★★★★4.9
Tore out 900 square feet of tile and laminate in our Westlake home in two days. Dust walls kept the rest of the house clean, and they ground the thinset flat. Installer started the next morning without any prep work of his own.
Yelp ★★★★★4.8
Called about water damage in our Pflugerville rental. They were on-site the next morning, pulled the wet laminate, and moisture-tested the slab before we installed new flooring. Honest about what needed replacing and what did not.
BBB ★★★★★4.9
Professional crew, showed up on time, hauled everything off the same day. They found pet stains under the old carpet in our Zilker bungalow and treated the subfloor before install. Fair price and no surprise charges.
General Wood Flooring LLC has been tearing out and rebuilding Austin floors since 2022. In four years we have pulled tile, hardwood, laminate, and vinyl plank out of bungalows in Travis Heights, 1990s builds in Circle C, and new construction in Cedar Park. Our crew is trained on dust containment, moisture testing, and subfloor prep, and we work to NWFA Certified Installer standards on every job. We are EPA Lead-Safe Certified for pre-1978 homes, which matters in older Austin neighborhoods where lead paint can hide under trim and thresholds. We carry a Texas state contractor license, OSHA Safety Compliance training, and we are a BBB Accredited Business.
Real experiences from customers who chose our Floor Removal & Demolition services.
“We had 1,200 square feet of old tile and laminate that needed to come out before new hardwood went down. The crew showed up at 8 a.m., had the dust walls up by 8:45, and finished the whole tear-out in two days. They ground the thinset flat and hauled everything off. Our installer said it was the cleanest subfloor he had seen in years.”
Marcus T.
Homeowner, Circle C
“A slab leak ruined our laminate in the living room. General Wood Flooring pulled the wet floor, checked the slab with a moisture meter, and found pet stains from the previous owners that we did not know about. They treated it, ground the high spots, and had us ready for new flooring in three days. Fair price, no drama.”
Priya R.
Homeowner, Zilker
“We manage six rental units near Downtown and needed fast tear-out between tenants. They pulled carpet and old vinyl from two units in one day, hauled it all off, and left the slabs clean. We booked them again for the next turnover. Reliable crew, honest pricing, and they actually answer the phone.”
Daniel K.
Property Manager, Downtown Austin
Real answers to the questions we hear most often from local homeowners and property managers.
Once the old floor is out and the subfloor is flat, we install new hardwood the same week. Most Austin customers pair tear-out with installation to save on mobilization and get one crew handling the whole job.
View Hardwood Floor InstallationEngineered hardwood planks are a strong fit for Austin slabs where humidity swings. We tear out the old floor, moisture-test the slab, and install engineered planks with the right underlayment for your home.
View Engineered Hardwood InstallationSolid hardwood planks need a flat, dry subfloor. Our tear-out service gets you there, and we handle the install with flooring nails, a flooring stapler, and a floor roller for a tight, even finish.
View Solid Hardwood InstallationIf your existing hardwood has life left, you may not need tear-out at all. We sand, stain, and refinish with Bona or Duraseal products, saving you the cost of new material and a full demolition.
View Hardwood Floor RefinishingOur dustless sanding rig pairs well with tear-out jobs where the old finish has to come off. We use a drum sander and edge sander with HEPA extraction, keeping dust out of your HVAC and cabinets.
View Dustless Sanding & RefinishingAfter tear-out and new install, many Austin homeowners want a specific stain color. We work with Minwax and Duraseal to match existing trim or go darker for a modern look.
View Floor Staining & Color ChangeCall us at 512 877 7960 or send an email and we will get back to you the same business day. We answer the phone Monday through Friday, 8am to 6pm, and we run 24/7 emergency response for water-damaged floors. Same-day estimates across Austin and Travis County.
Phone
512 877 7960Address
6900 Deep Cir, Austin, TX 78744
Hours
Mon–Fri: 7AM – 7PM
Sat: 8AM – 4PM
Sun: Emergency Only
24/7 Emergency Available